Obike
Map
Projects
Search
Huntmar Widening and Stittsville Main Extenstion
Innes and Lamarche Protected Intersection
Integrated renewal – de l’Église Street
Integrated Road, Sewer and Watermain for Canterbury Avenue, Arch Street and Plesser Street
James Street & Kent Street – Integrated Sewer, Watermain and Road Renewal
Johnwoods Pathway Extension
Kanata North Community Design Plan
Kent Street Functional Design Study (Somerset Street to Catherine Street)
Laurel St Active Transportation Corridor
Laurier and Percy Traffic Signal
Laurier Avenue Cycling Modifications
LeBreton Flats Masterplan
LeBreton Pathway
Leitrim Road Realignment
Light Rail Transit Stage 2
Lincoln Fields Mall Redevolopment
Lincoln Fields Secondary Plan
Longfields Dr and Highbury Park Protected Intersection
Longfields Drive and Jockvale Road Protected Intersection RSAP
Lowertown Cycling Connections
Lyon Bike Lane
Mackenzie Avenue to Rideau Canal Eastern Pathway- Upgrade of Cycling Link
Mackenzie King Bridge Renewal
Madawaska Bike Lane
March Rd BRT
Mattamy Homes
McCarthy Road Cycling Facility
McKenna Casey Drive Realignment
Mer Bleue Phase 1
Mer Bleue Rd Realignment
Mer Bleue Rd Urbanization
Mer Bleue Secondary Plan
Merivale Rd Community Design Plan
Monahan Drain to Trans Canada Trail MUP
Montreal Road Revitalization
Montreal-Blair Road Transit Priority Corridor
NCC Core Plan Sussex Bikeway
Neighbourhood Plan for South Stittsville
Nicholas St Bikeway
Normandy Crescent and Valmarie Avenue integrated renewal
North River Rd Traffic Calming
NRC Campus Master Plan
O-Train Stage 3 LRT
O’Connor Phase 2
O’Connor Street Safety Improvements
Ogilvie & Cummings Protected Intersection RSAP
Old Montreal Rd Devolopment
Orleans Corridor Draft Plan
Ottawa River South Shore Riverfront Park
Parkdale Ave at Sherwood Dr Signal
Parkway & Transitway Bridge facility & Sawmill Connection
Pathway to connect Parking Lot at Berry Glen Park w/ sidewalk on Woodroofe Ave.
Percy Bike Lane
Pike Street and Lorry Greenberg Drive – Neighbourhood Traffic Calming Study
Pinecrest Secondary Plan
Portobello Blvd Ext
Preston-Carling Secondary Plan
Pretoria Avenue Road and Sewer Renewal
Reconstruction of Albert Street/Queen Street/Slater Street from Empress Avenue to Bay Street and Bronson Avenue from Queen Street to Laurier Avenue
Revitalizing Public Space in the ByWard Market
Richmond Rd Cycle Westbound Track
Riverain District Devolopment
Riverside South Public High School
Riverside South Secondary Plan
Robert Grant Extenstion
Robert Grant Full Build Out
Romina St Protected Intersection
Saint Patrick Street Bridge – Bikeway Modifications
Scott Street Protected Intersections – Parkdale Avenue to Bayview Station Road
Scott Street Sewer and Watermain Rehabilitation Project
Shea Village
Sherwood Drive Traffic Calming Study
Smart Centres TIA
Smyth Road Cycling Safety Improvements and Neighbourhood Bikeway Modifications
Springfield Resurfacing
St-Mary’s Subdivision
St. Laurent Blvd Transit Priority Corridor
St. Patrick Street Cycling Safety Improvements
Station TOD Plans
Stillwater Station
Stittsville Main St Study
Strandherd Drive widening (Maravista Drive to Jockvale Road)
Sussex & King Edward Intersection RSAP
Tenth Line Urbanization
Tesasini Park
Tewin
The Conservancy
Tompkins Avenue, Duford Drive, Prestone Drive and Major Road – Bike Lanes
Transportion Master Plan
Trillium Path Seperation
Tunney’s Pasture Master Plan
Valin Roundabout
Valley Drive storm sewer trunk rehabilitation
Vanguard Drive Extenstion
Varennes Boulevard Neighbourhood Traffic Calming Study and Valin Street Active Transportation Project
Walkley Airport Parkway Project
Walkley Road East Cycling Facility
Walkley Road West Cycling Facility
Wallford Way, Farlane Boulevard, Hilliard Avenue, Millbrook Crescent, Deer Park Road Traffic Calming
Wateridge Village Secondary Plan
←
Previous Page
Next Page
→